Ege Ev Urunleri Phase 1
Click to enlarge
Siphonic Drainage
Torbali, Izmir
Project Summary & Execution Details
Siphonic system infrastructure that safely drains high rainfall flow rates was fabricated in the Ege Ev Urunleri Phase 1 factory building.
Technical Scope & Work Performed
- Siphonic Rainwater Drainage System
Get in Touch for Your Project
Need roof cladding, single-ply waterproofing, or siphonic stormwater drainage for your facility?
Request a Quote
Get a Project Quote
Engineering Solutions for Your Industrial Facility
Discuss your membrane roofing, siphonic drainage, and sandwich panel cladding requirements with our technical team.